Industrial History Online

The IHO website holds 35140 records and 9110 images



Ferrybridge A - Knottingley

One of the two three-stage turbo-alternator sets installed in 1927 at the Ferrybidge power station. Running at 3000 rpm, each set could develop a maximum of 19 MW continuous load. Taken from 'The Engineer' of October 28th 1927.

Date 1927

Industrial History Online is funded by the Yorkshire Archaeological & Historical Society CC-BY-NC-SA-4.0